Pearland Parkway Traffic Circle Modifications

Print
Press Enter to show all options, press Tab go to next option

Project Overview 

AboutThe purpose of reconfiguring the traffic rotary is to improve traffic flows by providing higher speed by-pass movement that result in a right existing movement and reduce existing two lane configuration conflicts.  Traffic analysis of accident from this area indicate changes will reduce injury accidents without a need to add traffic signals that impede traffic flows and increase commute times. 

Scope: Design and construct improvements to the existing rotary traffic circle at the intersection of Pearland Parkway and McHard to provide a more conventional geometry with a two lane roundabout with an outside by-pass lane designed for higher speeds for the right-turn movements. The project will also install sidewalks to connect existing gaps and provide pedestrian connectivity.

Residents can also register to reveive project updates through the City’s e-notification system Everbridge.  Project information is often available through the City’s FaceBook page, Twitter and Instagram accounts as well.  We encourage residents and property owners’ to sign up for the e-alerts and information, please contact Fatema Weekly, Project Manager, at fweekly@pearlandtx.gov

This project is part of the 2019 Bond referendum. 

Schedule Info

   Base Line  Current 
Design Start   July 2019     July 2019 
 Bid Start  January  2020  
 Construction Start   March 2020  
 Proposed Construction Completion  March 2022  

Budget and Funding Info
2019

Project Area