About. This project consists of the reconstruction of concrete neighborhood streets Orange Circle and Linwood Oaks for 2019. The reconstruction projects are based on priorities derived from the Right-of-Way Assessment and resulting Pavement Condition Index (PCI) and will replace existing concrete pavement with new concrete pavement in the identified neighborhoods. The 2019-20 project includes a Waterline replacement on Orange Circle. 

This project is a part of a larger Street Reconstruction project that also includes Sleepy Hollow subdivision and Sherwood subdivision in the future. 

This project is part of the 2019 Bond referendum. 